Manufacturing
Manufacturing
Every Tissenbach tool is designed, ground and measured in our plant in Gebze, Kocaeli. The machine park below is what makes 5 to 15 working days for a special possible.



Machine park
| Machine | What it does | Year |
|---|---|---|
| 5-axis tool grinder with robot loaderTool grinding, unattended loading | Tool grinding, unattended loading | 2024 |
| 5-axis tool grinderFlute, cylindrical and profile grinding | Flute, cylindrical and profile grinding | 2019 |
| 4-axis profile grinder, 3 robotsProfile grinding, robot loading | Profile grinding, robot loading | 2021 |
| Optical tool measuring machineTool measurement before shipment | Tool measurement before shipment | 2019 |
| 5-axis diamond and CBN wheel dresserGrinding wheel preparation | Grinding wheel preparation | 2025 |
| 4-axis wire EDMCarbide blanks and form tools | Carbide blanks and form tools | 2019 |
| 5-axis machining centre, 40,000 rpmPrototypes and tool testing | Prototypes and tool testing | 2021 |
| 3-axis machining centreCNC machining and tool testing | CNC machining and tool testing | 2014 |
| Sinker EDM, fast hole drillingSmall and deep holes in carbide | Small and deep holes in carbide | 2014 |
| 30 W laser markingPermanent tool marking | Permanent tool marking | 2018 |